They also filled the gaps between the chimney and the logs with foam. They have the mortar mix in a plastic bag on the porch. They plan to use that to cover up the foam and finish the job.
All their work should protect the logs and the grey chink and caulk almost matches the logs. The cabin will probably need a coat of paint before long.

No comments:
Post a Comment